A full property renovation involves dozens of individual tasks.
Doing them in the wrong order can create unnecessary expense, delays and repeated work.
Although every project is different, successful refurbishments generally follow a logical sequence.
Start With Surveys and Planning
Before construction begins, understand the property.
This stage may include:
- Assessing the structure
- Identifying damp or defects
- Reviewing plumbing and electrics
- Developing layouts
- Structural design
- Planning permissions where required
- Building Regulations considerations
Good preparation reduces surprises during construction.
Strip Out
Old kitchens, bathrooms, flooring, unwanted partitions and redundant fittings can then be removed where appropriate.
This exposes the building and provides access for structural and service work.
Structural Alterations
Load-bearing wall removal, new openings, steels and major construction should normally happen before decorative work.
If an extension or conversion forms part of the project, the main shell construction will also feature early in the programme.
Biggin Renovations provides both property renovation and structural construction services.
First-Fix Plumbing and Electrics
Before walls are closed up, cables and pipework need to be positioned.
This is the point to plan:
- Sockets
- Lighting
- Heating
- Kitchen appliances
- Bathrooms
- Internet/data
- Underfloor heating
- Hot-water systems
Plastering
Once major first-fix work is complete, walls and ceilings can be prepared and plastered.
Adequate drying time should be allowed before decorative finishes are applied.
Kitchens and Bathrooms
Installation sequencing varies depending on the specification, but kitchen and bathroom fit-outs follow once the necessary structural and service preparation is complete.
Biggin Renovations also undertakes kitchen refurbishment as part of wider renovation projects.
Joinery and Second Fix
Doors, skirting boards, architraves, electrical accessories, taps and other second-fix elements move the property closer to completion.
Flooring and Decoration
Final floor finishes and decoration need careful sequencing to prevent completed work being unnecessarily damaged by other trades.
Snagging and Handover
Every substantial project should finish with inspection and snagging.
Minor adjustments and finishing details can then be resolved before final handover.
Why Coordination Matters
A complete renovation involves multiple trades whose work is interconnected.
Moving a kitchen affects plumbing and electrical requirements.
Removing a wall affects structure, plastering and flooring.
Replacing heating can affect almost every room.
Managing the project as one coordinated programme therefore provides major advantages.
Biggin Renovations Group delivers complete residential renovation services throughout South London, Surrey and Kent.
For a free no-obligation consultation, call 07507 476 504.
FAQs
Should electrics be done before plastering?
First-fix electrical work is normally completed before walls are fully finished.
When should structural work happen?
Major structural alterations should generally be completed early in the main construction programme.
Should I install the kitchen before flooring?
The correct sequence can depend on the type of flooring and kitchen design, so this should be planned beforehand.
Can I live in the house during a full renovation?
Sometimes, although substantial projects can make temporary accommodation more practical.
Who coordinates the different trades?
A fully managed renovation company can coordinate the different stages as one overall construction programme.